Texas Department of Transportation – South Shaver Road Reconstruction

From the Office of Council Member Mike Sullivan 
For Immediate Release – September 12, 2012

PRESS RELEASE
NOTICE: Texas Department of Transportation 
South Shaver Road Reconstruction

The City of Houston and the Texas Department of Transportation propose to reconstruct South Shaver Road from IH 45- State Highway 3 in Houston, Harris County.  The proposed project would reconstruct South Shaver Road from a 6-lane undivided roadway with parallel drainage ditches to a 6-lane divided roadway with curbs and gutters and a raised median.  The project also includes widening 1/2 mile of Berry Bayou and building a 13.2 -acre detention basin north of South Shaver Road.  No additional right-of-way is required for the roadway project, and Harris County Flood Control District is providing additional right-of-way for the drainage facilities.

Maps showing the project location and design, an environmental assessment, tentative construction schedules, and other information relative to the project are on file and available for inspection at the TxDOT Houston District Office, located at 7600 Washington Avenue, Houston, 77007.
The TxDOT office is open Monday through Friday, from 8:00am- 5:00pm.

All interested persons may request that a public hearing be held covering the social, economic and environmental effects of the proposed project by mailing or delivering a written request to the Director of Project Development, P.O. Box 1386, Houston, Texas 77251 on or before October 3, 2012.  If a request is received that warrants a public hearing, a public hearing will be scheduled, and adequate notice, providing the date and location of the hearing, will be published.

You may also like...